City To Build New “Green” Fire Station

winter-haven-fire-safety-complex

Construction will begin soon on a new 21,000 square-foot fire station. The City of Winter Haven has closed on the $400,000 purchase of property on U.S. 17 South near Andy’s Igloo. The site, combined with previously owned city property totals more than two acres. After 37 years at 551 Third Street, NW adjacent to City Hall, the Fire Department has outgrown its building.

The building will be the City’s first “green” structure as a Silver Leadership in Energy and Environmental Design (LEED) certified building. LEED certifies the building’s construction complies with U.S. Green Building Council (USGBC) guidelines and standards for environmentally sustainable construction. The new fire complex was designed to preserve large established trees currently on the site.

This entry was posted in City of Winter Haven, General Announcements. Bookmark the permalink.

One Response to City To Build New “Green” Fire Station

  1. Jean Reed says:

    Good for the city of Winter Haven for building “green”.
    This is very exciting news!

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>